Learn Essays

HOME F.A.Q. REGISTER LOGIN SEARCH  
Essay Topics
Acceptance
Art
Business
Custom Written
Direct Essays
English
Example Essays
Foreign
History
Medical
Mega Essays
Miscellaneous
Movies
Music
Novels
People
Politics
Pre-Written
Religion
Science
Search
Speeches
Sports
Technology

Click here to get paid up to $147 / hour to take simple surveys


Featured Papers from Rad Essays

1. Spanking: An Effective Method of Discipline
2. Scientific Method
3. The Comparative Method
4. Main memory
5. Observe and Evaluate
This is only a preview of the paper
Click here to register and get the full text.
Existing members click here to login

main objective is to evaluate the adopted method for assembling pens by performing and analyzing a

INTRODUCTION

Given that the main objective of this lab is to evaluate and improve a current work method to assemble pens, a detailed motion study was conducted, followed by a time study in order to determine the average assembly time per piece. ...      Description of the current assembly method

The assembly method is divided into eight operations that can be subdivided as follows:
1)     Get shell with the left hand, given that the right hand is idle, as follows:
a)     Reach the shell positioned at a distance of 4” with the left hand. ...      Collecting data:
In order to calculate the time needed for each operation the following cases were adopted:
•     Consider case B for all operations since one can reach any components in a box. ...
•     Consider case B for the move operation when moving back to the original position
•     Consider case A when assembling the ink recharge and the shell or the front cap and the partially assembled part. ...      Posting the results:

Figure 4:Operator process chart for the first method

DETAILED TIME STUDY

The time needed for each operation was rated. Following the same work method technique, the assembly of a pen was divided into 6 operations rather than 8. ...

We performed a time study for 200 pens, each operator rating the corresponding time. We found that on average the cycle time for assembling a pen is 5. ... 103           




PROPOSAL OF AN IMPROVEMENT METHOD
1.     Description of the layout

Given that a pen is composed of 4 components as in Figure 1, an improved method was suggested in order to decrease the average assembly time of a pen. ... Note that both hand will start at the same time, thus performing the following sub operations:
a)     Reach shell and ink recharge, each in a different hand. ...      Operator process chart

Using Tables 1,2,3,4,5 and 6 in Appendix A, we considered the same cases mentioned in the motion study of the current work method in order to derive the cycle time for assembling a single pen as described by the operator process chart in Figure 6.


Approximate Word count = 1491
Approximate Pages = 6
(250 words per page double spaced)
Over 101,000 Essays and Term Papers!!
Links
LCD interfacing with PIC16F877

main objective is to evaluate the adopted method for assembl



Pens vs Pencils

SMC Training

Decision usefuness and GAAP

Support
F.A.Q.
Custom Essays
Payment
Learn Essays
Forgot Password?
Activation Email
More Links
All Papers Are For Research And Reference Purposes Only! You may not turn these papers in as your own! You must cite our web site as your source!
Copyright 2003-2008 learnessays.com. All rights reserved.