<&AST>USACE / NAVFAC / AFCESA UFGS-02300 (August 2003) ---------------------------Preparing Activity: USACE Superseding UFGS-02300A (December 1997) UFGS-02315A (June 2003) UFGS-02315N (June 2003) UFGS-02316A (June 2003)UNIFIED FACILITIES GUIDE SPECIFICATIONS<&AST>SECTION 02300EARTHWORK08/03<&AST>NOTE: This guide specification covers the requirements for earthwork activities for buildings, utilities, roadways, railroads, and airfields. ... 8 CRITERIA FOR BIDDING<&AST>NOTE: For most projects, the scope of earthwork can accurately be determined. However, if earthwork is approximately known, a unit price for earth work should be provided in the Bid Schedule. ... The result is a lump sum bid with automatic provision for payment or credit due to variations in earthwork within 15 percent of that shown and bid upon.